The renovation of the existing correctional facility with a rated capacity of 926 inmates to hold 400 inmates that are being relocated from the infirmary at Men’s Central Jail. The existing building infrastructure has been assessed, repaired and upgraded. The existing housing and clinics, restroom facilities, repurposed program spaces, and visitation area have been upgraded to comply with ADA and Life Safety requirements to adequately service the intended inmate population.
Roshanian and Associates, Inc. provided:
Mechanical and Electrical Engineering, Site Investigation, Design Documentation, Preparation of Construction Documents, and Support for Bidding and Construction Phase for HVAC, Plumbing, Power, Lighting and Fire Alarm /Signal systems.