K-12 New Campuses
Willow Elementary

client
LAUSD
architects
HMC Architects
year
2011
scale
57,950 SF
construction-budget
$63,265,091

Gallery

Project Summary

The New Campus was led by three key initiatives; to maximize playground areas on an urban site; to minimize traffic congestion; and to provide security while retaining a welcoming aesthetic.

The intersecting space between the buildings serves as the main entry to the campus, and is articulated by colored concrete, landscaping, and a multi-level covered bridge element that serves the upper floors of the classroom building.

The buildings include Administration, Library, Classrooms, Multi-purpose Room, and a Cafeteria. Play fields and surface parking were also added.