New LAN/ WLAN systems were provided for all 14 campuses. All existing data cabinets were removed. New MDF, IDF, and LDF cabinets were provided and installed with anchoring meeting new Seismic codes. New conduit/ pathways (where needed) and new fiber optic and copper cabling were installed. All 14 were Design Build Projects with at&t/ SBC Datacom as prime contractor.