<?xml version="1.0"?>
<!DOCTYPE gallery [
]>
<gallery base="" background="#FFFFFF" banner="#F0F0F0" text="#000000" link="#0000FF" alink="#FF0000" vlink="#800080" date="1/10/2006">
	<sitename>Featured Projects</sitename>


	<banner font="Arial" fontsize="3" color="#F0F0F0">
	</banner>
	<thumbnail base="images/thumbnails/" font="Arial" fontsize="4" color="#F0F0F0" border="0" rows="3" col="5">
	</thumbnail>
	<large base="images/" font="Arial" fontsize="3" color="#F0F0F0" border="0">
	</large>
	<photos id="images">
		<photo path="lausd-cla9-big.jpg"
       width="350"
       height="230"
       thumbpath="lausd-cla9-big.jpg"
       thumbwidth="74"
       thumbheight="48">
<project><![CDATA[New Central Los Angeles High School #9 <br />(Performing Arts Center)]]></project>
<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[This $170 million, 238,000-SF high school will   include 64 classrooms, a library, a performing arts theater, an amphitheater, a dance studio, a music studio, an art studio, a gymnasium, administration offices, a cafeteria with full kitchen, and underground parking. An AIA Award winner,  with 38 CHPS Score.]]></desc>
</photo>
<photo path="laccnecampus-big.jpg"
       width="274"
       height="210"
       thumbpath="laccnecampus-big.jpg"
       thumbwidth="57"
       thumbheight="44">
<project><![CDATA[New Los Angeles City College -Northeast Campus]]></project>
<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[New satellite campus includes the renovation and modernization of the historic  Van de Kamp Bakery into a two story, 41,785 sq. ft.  structure, with classrooms and offices. Also included are a new two-story, 36,671 sq. ft., education classroom building  and a new 1,906 sq. ft. Central Plant building. All building will be built to LEED standards, and will generate more than 10 percent of energy needs from renewable and clean energy sources.]]></desc>
</photo>
<photo path="Embassy2-big.jpg"
       width="350"
       height="285"
       thumbpath="Embassy2-big.jpg"
       thumbwidth="74"
       thumbheight="66">
<project><![CDATA[New Embassy Suite Hotel<br/>Garden Grove, CA]]></project>
<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[375 two-room suites in a 14 story tropical atrium and 30,000 sq. ft. of flexible social and meeting space.]]></desc>
</photo>
<photo path="OFFICE 021-big.jpg"
       width="350"
       height="226"
       thumbpath="OFFICE 021-big.jpg"
       thumbwidth="74"
       thumbheight="47">
<project><![CDATA[New Wilshire/ Wellesley  Mixed Use]]></project>
<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[Six story, 200,000 sq. ft.  building with 48 luxury condominiums and 60 affordable apartments, 16 retail spaces on the ground-floor, deck top pool on the third-floor, and underground parking.]]></desc>
</photo>
<photo path="St. Joseph 2-big.gif"
       width="350"
       height="225"
       thumbpath="St. Joseph 2-big.gif"
       thumbwidth="74"
       thumbheight="47">
<project><![CDATA[Saint Joseph Medical Center]]></project>
<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[&bull;	Campus wide Life Safety and Fire Alarm system Upgrade<br />
              <br />&bull;	Skilled Nursing Unit conversions (two hospital buildings converted to skilled nursing units).  <br />
              <br />The firm assisted the client in preparing detail design, securing OSHPD approval, cost estimates and observation of construction. ]]></desc>
</photo>
		<photo path="Paramount Studios-big.jpg" width="350" height="263" thumbpath="Paramount Studios-big.jpg" thumbwidth="74" thumbheight="55">
			<project><![CDATA[Paramount Studios]]></project>
			<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
			<client><![CDATA[Los Angeles Unified School District ]]></client>
			<disciplines><![CDATA[Electrical, Technology]]></disciplines>
			<desc><![CDATA[Stage 3, 10, 26 and 27 renovations.]]></desc>
		</photo>
<photo path="EastLA2.jpg"
       width="350"
       height="203"
       thumbpath="EastLA2.jpg"
       thumbwidth="74"
       thumbheight="43">
<project><![CDATA[New East Los Angeles High School #2]]></project>
<architect><![CDATA[Nadel + Barrio Architects]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[This $144 million, 220,000 SF campus will consist of five small learning communities that include 86 classrooms, science labs, and academy administration. School facilities shared by the small learning communities will include performing arts classrooms, a library, multi-purpose room, two gymnasiums, food service and lunch shelter, central administration, playfields, and underground parking. 28 CHPS Score. ]]></desc>
</photo>

		<photo path="Universal Studios-big.jpg" width="320" height="240" thumbpath="Universal Studios-big.jpg" thumbwidth="67" thumbheight="50">
			<project><![CDATA[Universal Studios Tours]]></project>
			<architect><![CDATA[Nadel + Barrio Architects]]></architect>
			<client><![CDATA[Los Angeles Unified School District ]]></client>
			<disciplines><![CDATA[Electrical, Technology]]></disciplines>
			<desc><![CDATA[Tour attraction, Tour Center remodel and renovation, custom area lighting, fast food/retail shops.  ]]></desc>
		</photo>

		<photo path="Galt police station-big.jpg" width="350" height="233" thumbpath="Galt police station-big.jpg" thumbwidth="74" thumbheight="51">
			<project><![CDATA[New Galt Police Station]]></project>
			<architect><![CDATA[Nadel + Barrio Architects]]></architect>
			<client><![CDATA[Los Angeles Unified School District ]]></client>
			<disciplines><![CDATA[Electrical, Technology]]></disciplines>
			<desc><![CDATA[This new 60,000 Sq. Ft. police Station, has a dispatching center, a jail and a service building for the maintenance of trucks and cars. 
]]></desc>
		</photo>		
<photo path="lamc.jpg"
       width="345"
       height="246"
       thumbpath="lamc.jpg"
       thumbwidth="72"
       thumbheight="52">
<project><![CDATA[Los Angeles Mission College]]></project>
<architect><![CDATA[Nadel + Barrio Architects]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[Athletic Field and support facilities – The firm worked with the architect to prepare design development drawings.]]></desc>
</photo>
<photo path="Central regional hs 13.jpg"
       width="350"
       height="148"
       thumbpath="Central regional hs 13.jpg"
       thumbwidth="77"
       thumbheight="33">
<project><![CDATA[New Central Region High School #13 ]]></project>
<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[This $161 million, 213,000 SF high school will consist of five small learning communities that include 85 classrooms, science labs, and academy administration. School facilities will include performing arts classrooms, a library, multi-purpose room, two gymnasiums, food service and lunch shelter, central administration, playfields, and surface parking. An AIA award winner! The electrical design has achieved the highest CHPS Score (42) for high schools in the program to date, beating Title 24 requirements by 50%. ]]></desc>
</photo>
		<photo path="Hitchcock Theatre-big.jpg" width="203" height="134" thumbpath="Hitchcock Theatre-big.jpg" thumbwidth="77" thumbheight="51">
			<project><![CDATA[Universal Studios]]></project>
			<architect><![CDATA[Nadel + Barrio Architects]]></architect>
			<client><![CDATA[Los Angeles Unified School District ]]></client>
			<disciplines><![CDATA[Electrical, Technology]]></disciplines>
			<desc><![CDATA[Hitchcock Theater.]]></desc>
		</photo>
		

		



		<photo path="LA County Department of Public Social Services big.jpg" width="350" height="235" thumbpath="LA County Department of Public Social Services big.jpg" thumbwidth="74" thumbheight="49">
			<project><![CDATA[County of Los Angeles Department of Public Social Services
]]></project>
			<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
			<client><![CDATA[Los Angeles Unified School District ]]></client>
			<disciplines><![CDATA[Electrical, Technology]]></disciplines>
			<desc><![CDATA[Total renovation of existing 60,000 square feet building per County specification. The firm worked with the developer, providing detailed drawings, specification and construction observation services. The firm also incorporated the clean power requirement for the computer center in the building.]]></desc>
		</photo>
<photo path="Bentley seven-big.jpg"
       width="280"
       height="241"
       thumbpath="Bentley seven-big.jpg"
       thumbwidth="59"
       thumbheight="51">
<project><![CDATA[New Bentley seven Condominiums]]></project>
<architect><![CDATA[Nadel + Barrio Architects]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[A LEED-driven project. this seven unit, 10,110 sq. ft. condominium with 6000 sq. ft. parking,  uses photovoltaic panels to generate most of the energy used in the building.]]></desc>
</photo>
		<photo path="US Department of Labor  027.jpg" width="350" height="276" thumbpath="US Department of Labor  027.jpg" thumbwidth="74" thumbheight="58">
			<project><![CDATA[US Department of Labor]]></project>
			<architect><![CDATA[Nadel + Barrio Architects]]></architect>
			<client><![CDATA[Los Angeles Unified School District ]]></client>
			<disciplines><![CDATA[Electrical, Technology]]></disciplines>
			<desc><![CDATA[The firm worked with the architect, providing details drawings, specification and construction observation services for renovation of 11 story building.]]></desc>
		</photo>

		
		
		
		<photo path="lacv1-big.jpg"
       width="350"
       height="219"
       thumbpath="lacv1-big.jpg"
       thumbwidth="74"
       thumbheight="46">
<project><![CDATA[Valley Community College]]></project>
<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[Upgraded existing medium voltage (5 KV) distribution system. The firm worked directly with the district to prepare detailed design, specification and observation of construction.]]></desc>
</photo>
<photo path="woodele-big.jpg"
       width="315"
       height="191"
       thumbpath="woodele-big.jpg"
       thumbwidth="66"
       thumbheight="40">
<project><![CDATA[New Woodcrest Jr. High School]]></project>
<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[This $35 million, 71,000 SF middle school consisting of 48 classrooms, a library, multi-purpose room, cafeteria, gymnasium, and administration was completed in 2002.]]></desc>
</photo>



<photo path="UCLA parking-big.jpg"
       width="300"
       height="225"
       thumbpath="UCLA parking-big.jpg"
       thumbwidth="63"
       thumbheight="47">
<project><![CDATA[University of California Los Angeles<br />
					  (UCLA)]]></project>
<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[Parking Structures Lighting Retrofit – The firm worked with contractor to provide drawings and specification for lighting retrofit for various parking structures.]]></desc>
</photo>




<photo path="Kaiser Permanente Hospital  big.jpg"
       width="350"
       height="220"
       thumbpath="Kaiser Permanente Hospital  big.jpg"
       thumbwidth="74"
       thumbheight="46">
<project><![CDATA[Kaiser Permanente Hospital]]></project>
<architect><![CDATA[Nadel + Barrio Architects]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[Remodeling Acute Care Unit and installation of food preparing units. The firm assisted the architect in preparing detail design, securing OSHPD approval, cost estimates and observation of construction.]]></desc>
</photo>
<photo path="lausd-v1-big.jpg"
       width="350"
       height="233"
       thumbpath="lausd-v1-big.jpg"
       thumbwidth="74"
       thumbheight="49">
<project><![CDATA[New Valley High School #1]]></project>
<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[This $38 million, 183,000 SF Academy High School is comprised of three buildings constructed on top of a underground parking garage. school facilities include 38 classrooms, administration, library, multipurpose room, cafeteria, gymnasium, and athletic field. The campus classrooms are audio-visually linked with Cal State Northridge. Completed September 2004. ]]></desc>
</photo> 
<photo path="OFFICE 020-2-big.jpg"
       width="350"
       height="228"
       thumbpath="OFFICE 020-2-big.jpg"
       thumbwidth="74"
       thumbheight="48">
<project><![CDATA[New Specialty Surgery Center of Beverly Hills]]></project>
<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[Three story medical building, 90,000 sq. ft., consisting of outpatient surgery centers and medical offices.]]></desc>
</photo>



<photo path="embassy-lv-big.jpg"
       width="350"
       height="290"
       thumbpath="embassy-lv-big.jpg"
       thumbwidth="74"
       thumbheight="61">
<project><![CDATA[New Embassy Suite Hotel<br/>Las Vegas, NV]]></project>
<architect><![CDATA[Nadel + Barrio Architects]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[212,000 sq. ft. - $36 Million, 11 story, 287 two-room suites.]]></desc>
</photo>

<photo path="lausd-cla-ms4-big.jpg"
       width="350"
       height="247"
       thumbpath="lausd-cla-ms4-big.jpg"
       thumbwidth="74"
       thumbheight="58">
<project><![CDATA[New Central Los Angeles Middle School #4]]></project>
<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[This $99 million, 215,000 SF campus includes a two-story academic building housing administration, library, and classrooms that is joined by a pedestrian bridge to a building with a gymnasium, playing fields, a track, and parking. photovoltaics are used to generate electricity. Building of America award winner. Completed September 2006. ]]></desc>
</photo>



<photo path="California Market Center-big.jpg" width="350" height="233" thumbpath="California Market Center-big.jpg" thumbwidth="74" thumbheight="49">
			<project><![CDATA[California Market Center]]></project>
			<architect><![CDATA[Nadel + Barrio Architects]]></architect>
			<client><![CDATA[Los Angeles Unified School District ]]></client>
			<disciplines><![CDATA[Electrical, Technology]]></disciplines>
			<desc><![CDATA[The California Market Center is a 13-story building totaling nearly 3 million square feet. Parking is provided on three levels underneath the building, and in a six-level covered garage across Olympic connected by a pedestrian bridge. There are more than 1,000 showrooms in sizes ranging from 360 square feet to 36,000 square feet..]]></desc>
		</photo>

<photo path="crhs16.jpg"
       width="350"
       height="189"
       thumbpath="crhs16.jpg"
       thumbwidth="74"
       thumbheight="40">
<project><![CDATA[New Central Region High School #16]]></project>
<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[This $183 million, 206,000 SF high school will consist of four academies that include 75 classrooms. School facilities will include performing arts classrooms, a library, multi-purpose room, cafeteria, gymnasium/fitness center, administration, rooftop basketball fields, and parking structure. 28 CHPS Score.]]></desc>
</photo> 





<photo path="libertyes.jpg"
       width="187"
       height="137"
       thumbpath="libertyes.jpg"
       thumbwidth="70"
       thumbheight="52">
<project><![CDATA[New Liberty Elementary School]]></project>
<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[This elementary school consisting of 45 classrooms, a library, multi-purpose room, cafeteria, gymnasium, and administration was completed in 2002.]]></desc>
</photo>

<photo path="sres19.jpg"
       width="350"
       height="190"
       thumbpath="sres19.jpg"
       thumbwidth="74"
       thumbheight="40">
<project><![CDATA[New Central Region Elementary School #19]]></project>
<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[This $66 million, 98,000 SF elementary school will include 51 classrooms, a library, multi-purpose room, food service and lunch shelter, administration, playfields, and underground parking. Photocell based lighting and state of the art energy systems are incorporated to meet the goal of 30% below Title 24 requirements. 36 CHPS Score.]]></desc>
</photo>
<photo path="downtown jewelry Bldg-big.jpg" width="229" height="317" thumbpath="downtown jewelry Bldg-big.jpg" thumbwidth="59" thumbheight="81">
			<project><![CDATA[Downtown Jewelry Center]]></project>
			<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
			<client><![CDATA[Los Angeles Unified School District ]]></client>
			<disciplines><![CDATA[Electrical, Technology]]></disciplines>
			<desc><![CDATA[14 story office/retail/manufacturing building, 260,000 sq. ft.]]></desc>
		</photo>
<photo path="AlexandriaES1.jpg"
       width="350"
       height="233"
       thumbpath="AlexandriaES1.jpg"
       thumbwidth="74"
       thumbheight="49">
<project><![CDATA[New Alexandria Elementary School]]></project>
<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[This $28 million, 53,000 SF elementary school includes a 3-story classroom building with underground parking and a multi-purpose building. Completed September 2005. 24 CHPS Score.]]></desc>
</photo>

	<photo path="Universal Studios.jpg" width="250" height="317" thumbpath="Universal Studios.jpg" thumbwidth="43" thumbheight="54">
			<project><![CDATA[Universal Studios Corporate Headquarter]]></project>
			<architect><![CDATA[Nadel + Barrio Architects]]></architect>
			<client><![CDATA[Los Angeles Unified School District ]]></client>
			<disciplines><![CDATA[Electrical, Technology]]></disciplines>
			<desc><![CDATA[32 story  building. Tenant improvements and renovations.]]></desc>
		</photo>

<photo path="elahs1.jpg"
       width="350"
       height="174"
       thumbpath="elahs1.jpg"
       thumbwidth="74"
       thumbheight="37">
<project><![CDATA[New East Los Angeles High School #1]]></project>
<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[This $103 million, multilevel 113,685 SF high school will provide a campus like setting with a science focus in two distinct small learning communities, accommodating 1,028 students. Amenities include 38 classrooms and science labs, a library, multipurpose room, full service food service facilities, parent center, underground parking, competition gym and outdoor physical education facilities. It also includes a theater with a stage and classrooms for drama, dance, and media production. 22 CHPS Score. ]]></desc>
</photo>



		<photo path="model-shot-big.jpg"
       width="350"
       height="241"
       thumbpath="model-shot-big.jpg"
       thumbwidth="59"
       thumbheight="51">
<project><![CDATA[New Nemo Street]]></project>
<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[Four story, office spaces, top floor apartments, galleria, subterranean garage.]]></desc>
</photo>
<photo path="Ramonahs.jpg"
       width="350"
       height="190"
       thumbpath="Ramonahs.jpg"
       thumbwidth="74"
       thumbheight="40">
<project><![CDATA[New Ramona Opportunity High School]]></project>
<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[This $41 million, 51,000 SF high school will consist of 15 classrooms, a library, multi-purpose room, cafeteria, gymnasium, administration, and childcare. 28 CHPS Score.]]></desc>
</photo> 
		

		

		<photo path="Hollywood Bowl Shopping center-big.jpg" width="300" height="202" thumbpath="Hollywood Bowl Shopping center-big.jpg" thumbwidth="74" thumbheight="42">
			<project><![CDATA[New Hollywood Bowl Shopping Center]]></project>
			<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
			<client><![CDATA[Los Angeles Unified School District ]]></client>
			<disciplines><![CDATA[Electrical, Technology]]></disciplines>
			<desc><![CDATA[25,000 sq. ft. retail center.]]></desc>
		</photo>

<photo path="srhs7.jpg"
       width="350"
       height="203"
       thumbpath="srhs7.jpg"
       thumbwidth="74"
       thumbheight="43">
<project><![CDATA[New South Region High School #7]]></project>
<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
<client><![CDATA[Los Angeles Unified School District ]]></client>
<disciplines><![CDATA[Electrical, Technology]]></disciplines>
<desc><![CDATA[This $150 million, 188,000 SF high school will consist of three small learning communities that include 60 classrooms, science labs, and academy administration. School facilities shared by the small learning communities will include performing arts classrooms, a library, multi-purpose room, two gymnasiums, food service and lunch shelter, central administration, playfields, and underground parking. 28 CHPS Score.]]></desc>
</photo> 		

		<photo path="cryo Bank-big.jpg" width="300" height="233" thumbpath="cryo Bank-big.jpg" thumbwidth="74" thumbheight="49">
			<project><![CDATA[New Cryobank of California]]></project>
			<architect><![CDATA[HMC Architects/ Coop Himmelblau]]></architect>
			<client><![CDATA[Los Angeles Unified School District ]]></client>
			<disciplines><![CDATA[Electrical, Technology]]></disciplines>
			<desc><![CDATA[2 story, 10,000 sq. ft. special use laboratory designed with LEED criteria for sustainable design.]]></desc>
		</photo>

	</photos>
</gallery>